Renovimo

Reference

How long does paint take to dry

"Dry" is three different things: dry to the touch, dry enough for the next coat, and cured hard enough to scrub or set a shelf on. The sheets give all three, and the gap between the first and the last is where most ruined finishes happen.

How long does paint take to dry? Latex: 1 hour to the touch, 2–4 hours before the next coat, 14–30 days to cure. Oil-based: 2–6 hours to the touch, 16–24 hours between coats.

How long does paint take to dry: paint drying time chart

At 77 °F and 50% humidity, from the manufacturers' sheets. How many coats you need is on the coats guide.

PaintDry to touchRecoatFull cure
Interior latex, flat or eggshell 1 hour 2–4 hours 14–30 days
Interior latex, semi-gloss or gloss 1–2 hours 4 hours 30 days
Oil-based (alkyd) enamel 2–6 hours 16–24 hours 7–30 days
Waterborne alkyd (cabinet and trim enamel) 1–2 hours 16 hours 14–30 days
Exterior latex 1–2 hours 4 hours 30 days
Ceiling paint, flat 1 hour 2–4 hours 14 days
Chalk-style paint 30 minutes 2 hours 14–21 days

Primer drying times

PrimerDry to touchTopcoat afterFull cure
Latex primer 30 minutes 1 hour 7 days
Oil-based primer 30 minutes 1 hour 7 days
Shellac primer 15 minutes 45 minutes 3 days

How many coats of primer each surface needs, and how far a gallon goes, is on the primer guide.

Polyurethane, stain and varnish drying times

FinishDry to touchRecoatCure / use
Water-based polyurethane 30 minutes 2 hours 24 hours light use · 21 days full cure
Oil-based polyurethane within 3–4 hours 3–4 hours 24 hours light use · 30 days full cure
Spar urethane (oil-based, indoor/outdoor) within 4 hours 4–6 hours 24 hours light use · 30 days full cure
Interior oil-based wood stain 2 hours 4–6 hours 24 hours before topcoat
Deck and fence stain, water-based 1–2 hours 4 hours 48–72 hours before use
Deck and fence stain, oil-based 6–8 hours wet-on-wet, before the first coat dries; solid oil stain 24 hours 72 hours before use

Temperature and humidity

Below 50 °F (10 °C) Standard latex may not film; use a low-temperature exterior paint rated to 35 °F and allow double the recoat time. Oil-based and alkyd slow to two or three times the chart.
50–70 °F (10–21 °C) Recoat times run about half again as long as the chart.
70–85 °F (21–29 °C), under 70% humidity The chart's figures apply.
Above 85 °F or above 70% humidity Surface skins before the film dries underneath; double the recoat wait, and avoid direct sun on exterior work.

Work out the gallons with the paint calculator, then plan the coats around the recoat column.

Work out your paint →

Figures: Figures at 77 °F and 50% relative humidity unless the sheet states otherwise. Checked against: Behr Premium Plus interior product page (1 hour dry, 2 hours recoat); Kilz 2 All-Purpose data sheet (touch 30 minutes, paint over in 1 hour); Kilz Original oil-based primer data sheet (touch 30 minutes, topcoat after 1 hour); Sherwin-Williams Duration Exterior data sheet (touch 1 hour, recoat 4 hours at 45 °F and above); Rust-Oleum Stops Rust oil-based enamel product listings (touch 2–6 hours, recoat 24 hours); Minwax Fast-Drying Polyurethane and Helmsman Spar Urethane product pages (recoat 3–4 and 4–6 hours); Minwax Polycrylic data sheet (recoat 2 hours). Other rows are typical manufacturer ranges and vary by product. The sheet for the can in your hand has the final word; dark colors and heavy coats dry slower than the chart.

Paint drying questions

How long before a second coat of paint?

2–4 hours for latex, 16–24 hours for oil-based. Recoating early traps solvent and leaves a soft film that peels.

How long does paint take to cure?

14–30 days for latex. Dry to the touch in an hour, hard enough to wash in a week, fully cured in about a month — hang pictures after a week, scrub after a month.

How long does exterior paint take to dry?

1–2 hours to the touch and 4 hours to recoat in dry weather above 50 °F; keep rain off it for 24 hours.

How long does polyurethane take to dry?

Water-based: 2 hours between coats. Oil-based: 3–4 hours between coats. Either takes light use after about 24 hours, but a full cure takes three to four weeks, so keep rugs and heavy furniture off a floor until then.

How long does stain take to dry?

Interior wood stain: 24 hours before topcoat. Deck and fence stain: 48–72 hours before use water-based, 72 hours before use oil-based.

More in this series

These charts are what every paint and exterior estimate on the site is built from: coverage, coats, drying times and the siding underneath. Each tool applies them to one surface.

More reference

All reference charts